Project Overview:
ARC Document Solutions India Pvt. Ltd. Recently supplied and installed a full signage and visual branding solution for Blum-Novotest Manufacturing Facility.
From conception and design to manufacturing and installation, ARC undertook full responsibility for this key project, which involved establishing a high end signage solution.
The installation established a uniform brand image, with excellent navigation and impressive aesthetics for the client’s brand new state-of-the-art facility, that adhered to their global brand guidelines.
Project Scope:
ARC India provided End-to-End Signage Solutions
Building Facade Signs
- 1 English facade sign
- 2 Kannada facade signs
Self-Standing Monument Sign
- 1 English monument sign
Push-Through Wall Logos
- 4 Nos.
- Two logos installed at each of the two entrances
Address Signage
- 1 Indoor address sign
- 1 Outdoor address sign
Flag Pole Installation
- 4 Nos. (20 ft height)
- 5′ × 3′ double-sided UV printed satin flags
Indoor Fabric Glow Sign
- 12′ × 5′ illuminated History Wall
Complete Design Support
- Fabrication
- Installation
Materials & Technical Specifications:
Building Facade Signs
- Face Material: Cast Acrylic
- Return Material: Powder-coated Aluminium Trim Cap
- Illumination: Front Lit
- LED Modules: Samsung Interone (Made in Korea)
Monument Sign
- Structure: Mild Steel Fabrication
- Cladding: ACP
- Letters: Aluminium Trim Cap
- Finish: Premium Powder Coating
Push-Through Wall Logo
- Letters: 8 mm Cast Acrylic Push-Through Letters
- Back Structure: ACP Cladded Aluminium Structure
Indoor Fabric Glow Sign
- Fabric: Premium Backlit Fabric
- Frame: 100 mm Anodised Aluminium Frame
- Graphics: UV Printed Graphics
Major Project Challenges:
The project required careful planning and coordination to meet the client’s expectations.
- Tight Project Timeline
The entire project had to be completed within a strict delivery schedule without compromising quality.
- Precision Alignment
Large façade letters and push-through logos required accurate positioning to maintain brand consistency and visual balance.
- Night Installation
Certain installation activities were executed during night hours to minimise disruption to ongoing site operations.
- Electrical Routing
Internal wiring for illuminated signage was carefully concealed while ensuring easy maintenance access.
- Wind Load Considerations
Large facade signs and the self-standing monument sign were engineered to withstand wind loads while maintaining long-term structural stability.
Project Timeline:
Phase 1
- Design Development
- Client Approvals
- Production Planning
Phase 2
- In-house Fabrication: Approximately 15 Days
- Site Installation: Approximately 7 Days
The phased execution ensured smooth coordination between production and
on-site activities while meeting the project schedule.
Project Team:
- Designers
- Project Coordinators
- Fabrication Technicians
- LED Specialists
- Installation Engineers
- Site Supervisors
Client Objectives:
Project Objectives
The primary objectives of the project were:
- Establish strong brand visibility
- Create a premium identity for the new manufacturing campus
- Maintain global corporate branding standards
- Improve visitor wayfinding
- Deliver a modern and professional appearance
Client Feedback:
The client expressed appreciation for several aspects of the project, including:
✔ Excellent finish quality
✔ Timely project completion
✔ Professional installation standards
✔ Clear communication and continuous project coordination throughout execution
ARC's Contribution:
Complete Turnkey Signage Solution
From concept development to final installation, ARC India delivered a complete turnkey signage solution by providing:
- Design Consultation
- Engineering Support
- Manufacturing
- Quality Control
- Logistics
- Professional Installation
- Final Project Handover
With the completed Blum-Novotest project, ARC India has proven its capability to manage complex corporate signage installations with accuracy and efficiency, using premium materials and delivering exceptional services within the committed timeline.